projects
2022
Name: Isometric Drawings of Pipelines – Al-Jurf Field
The project aimed at drawing an isometric drawing for specific pipelines in FPSO ship according to the Mabruk Oil Operation (MOO) company selection. The project has been done by two site visits to the FPSO ship. The first one was to collect the required documents and take the measurements of the pipelines to start drawing. And the second one was to investigate the drawn documents and audit measurements, sizes, and directions. The project has been successfully completed.
Service Type:
Oil & Gas Engineering Services